Muara Tuang Army Camp at Kota Samarahan

Muara Tuang Army Camp at Kota Samarahan Completed in 2011 < Back to Previous Projects

Golden Palm @ 12th Mile

Golden Palm @ 12th Mile Golden Palm is strategically located along Jalan Kuching – Serian, a short 10 minutes drive brings you to nearby hypermarket, wet market, pharmacy, school, banks, restaurant as well as entertainment and food & beverage center. Lesser time spend on the road gives you a better quality of life. Golden Palm is designed with Green Concept in mind. […]

Vision Land 3

Vision Land 3 Strategically located along JLN Batu Kawa – Bau, a short 10 minutes drive brings you to nearby school, Banks, pharmacy, hypermarket, restaurant as well as entertainment and f&b center. The ‘Modern minimalist‘ design feature maximize space usability to suit a wide variety of family size and also better value for money. The Project is surrounded […]

Shun Lee Garden

Shun Lee Garden Double Storey Terrace House & Single Storey Semi-Detached House Complete in 21 Months (Year 2008) < Back to Previous Projects

Shun Tak Indah

Shun Tak Indah Shun Tak Indah (Near Kuching International Airport Double Storey Terrace House & Double Storey Semi-Detached House Completed in 13 Months (Year 2006) < Back to Previous Projects

Vision Land 1

Vision Land 1 63 Units Low Cost Plus Housing Development RM 3.04 Million Architect—Architect SKJ < Back to Previous Projects

Vision Land 2

Vision Land 2 (Sold Out) StructureReinforced concrete framework WallBrickwall Roof TilesConcrete interlocking roof tiles CeilingGypsum plaster ceiling to internal and superflex ceiling to external ceiling WindowsAluminium frame with light tinted glass DoorsDecorative Panel Door Wall Finishes Weather resistant paint finish to all external wall Emulsion paint finish to all internal wall Ceramic wall tiles up […]

Detached House for Datuk Tam Chiaw Tong

Detached House for Datuk Tam Chiaw Tong 1st Detached House for Datuk Tam Chiaw Thong at Bampfylde Road, Kuching Architects — Malaysian Association Architects Completed in 12 Months (Year 1984) < Back to Previous Projects

Double Storey Detached House (Jalan Ong Tiang Swee)

Double Storey Detached House (Jalan Ong Tiang Swee) Completed in 12 Months (Year 2006) < Back to Previous Projects

4 Storey Staff Dormitory ‘Sakura’

4 Storey Staff Dormitory “Sakura” 4 Storey Staff Dormitory “SAKURA” at Muara Tabuan, Kuching Completed in 8 months (year 2001) < Back to Previous Projects